High Wycombe Tavern
Challenges
From a supplied design, Diverse faced the challenge of manufacturing and installing a complicated cabinetry layout with a range of specialist finishes and exacting detail.
Solution
Diverse Shopfitters were able to manufacture all cabinetry components and efficiently coordinate the installation to deliver a result that honoured the design integrity from the original design concept.
Benefits
Bringing in this complicated fitout on budget and within the required timeframe allowed the High Wycombe Tavern to open for business sooner and trade with minimum disruption to patrons and staff.